Professional Cultured Stone Installation
813-924-5031
Fax813-949-3623
Stone Installation quote: |
Approximate Install Date: |
________________________ | |
Company: |
________________________ | Contact Name: |
________________________ |
Telephone(s): |
________________________ | Fax: |
________________________ |
Job Location: |
________________________ | ||
Quote: |
Labor Only |
Labor & Materials |
|
Job Description: (Interior/Exterior, New Construction/Remodel, heights, etc) |
Corner Calculations: | |||
1. Linear Feet of Corners: |
_________________________ | ||
2. Waste Factor (multiply #1 by .05): |
_________________________ | ||
3. Total Corners (add #1 & #2): |
_________________________ | Linear Feet of corners needed | |
Flat Calculations: | |||
4. Square ft. of wall surface (height x width): |
_________________________ | ||
5. Space used by corners (multiply #1 by .75): |
_________________________ | ||
6.Sub-total of Flast (subtract #5 from #4): |
_________________________ | ||
7. Waste Factor (multiply #6 by .05): |
_________________________ | ||
8. Total of Flats (add #6 & #7): |
_________________________ | Square Feet of flats needed | |
Wire Mesh Calculations (Wire mesh is not needed if stone is installed over clean block or brick) |
|||
9. Square ft of wall, (#4) divided by 16: |
_________________________ | sheets of mesh | |
Mortar Calculations: |
|||
10. Grouted joints, (#4) divided by 25: |
_________________________ | Bags | |
11. Ungrouted joints, (#4) divided by 33: |
_________________________ | Bags | |
Sand Calculations: | |||
12. 2 bags per bag of cement |
_________________________ | Bags | |
Nagle Stone | |||
Check: | At job Site | Provides | |
Mortar | __________ | __________ | |
Sand | __________ | __________ | |
Wire mesh | __________ | __________ (if needed) | |
Electric | __________ | __________ | |
Water | __________ | __________ | |
Scaffolding | __________ | __________ (for heights over 10 feet) |